LONGi has partnered with Pertamina New & Renewable Energy (Pertamina NRE) to establish a solar panel manufacturing facility in Indonesia.
The plant will be located in Deltamas, West Java, and will have an annual production capacity of 1.6 GW. It will deploy LONGi’s hybrid passivated back contact 2.0 technology. Manufacturing preparations are scheduled to commence by June 2025. The project is aimed at enhancing Indonesia’s domestic solar manufacturing capacity and advancing its national energy transition goals.