EQ Mazagine•04-04-2026April 04, 2026•3 min
powerplantSummary:
—
## **Basic Details**
| Item | Information ||——|————-|| **RfS No.** | SECI/C&P/IPP/11/0009/25-26 || **Dated** | 24 September 2025 || **Total Capacity** | 3,410 kW || **Mode** | RESCO (Capital expenditure by bidder; SECI/institute pays fixed tariff) || **Project Locations** | 11 projects across India |
—
## **Project-wise Capacity & Location**
| Project | Institute | Location | Capacity (kW) ||———|———–|———-|—————-|| P-1 | IIEST | Shibpur, West Bengal | 490 || P-2 | NITTR | Kolkata, West Bengal | 260 || P-4 | IIM | Tiruchirappalli, Tamil Nadu | 700 || P-5 | SVPISTM | Coimbatore, Tamil Nadu | 100 || P-6 | Udaan Bhawan | New Delhi | 500 || P-7 | RGNAU | Amethi, Uttar Pradesh | 175 || P-8 | CIIL | Mysuru, Karnataka | 200 || P-9 | NIFT | Bhubaneswar, Odisha | 110 || P-10 | HNBGU (Chauras Campus) | Srinagar Garhwal, Uttarakhand | 640 || P-11 | HNBGU (Srinagar Campus) | Srinagar Garhwal, Uttarakhand | 235 || **Total** | | | **3,410 kW** |
> *(Note: P-3 not listed – possibly omitted or not awarded in this tranche)*
—
## **L1 Winners (Rank 1) by Project**
| Project | L1 Bidder | Fixed Tariff (INR/kWh) ||———|———–|————————|| P-1 (IIEST) | Sunanda Solar Balaji Energy | 3.44 || P-2 (NITTR) | Sunanda Solar Balaji Energy | 3.51 || P-4 (IIM Trichy) | Sunanda Solar Balaji Energy | 3.15 || P-5 (SVPISTM) | Power Genesys | 3.95 || P-6 (Udaan Bhawan) | Sunanda Solar Balaji Energy | 3.26 || P-7 (RGNAU) | Sunanda Solar Balaji Energy | 3.80 || P-8 (CIIL) | Sunanda Solar Balaji Energy | 3.62 || P-9 (NIFT) | Sunanda Solar Balaji Energy | 3.80 || P-10 (HNBGU Chauras) | Sunanda Solar Balaji Energy | 3.71 || P-11 (HNBGU Srinagar) | Sunanda Solar Balaji Energy | 3.71 |
—
## **Key Observations**
### 🥇 **Dominant Bidder****Sunanda Solar Balaji Energy Development Private Limited**– Won **9 out of 11 projects** as L1– Consistently offered the lowest tariffs (₹3.15–₹3.80/kWh)
### 🥈 **Other L1 Winners**– **Power Genesys Private Limited** – won P-5 (Coimbatore) at ₹3.95/kWh
### 📉 **Tariff Range (L1)**– **Lowest**: ₹3.15/kWh (IIM Trichy, 700 kW)– **Highest**: ₹3.95/kWh (SVPISTM Coimbatore, 100 kW)
### 📈 **Competition**– **Solaris Electrical Services** was consistently Rank 2 or 3 across most projects, with tariffs between ₹3.75–₹4.30/kWh– **Kshitij Kumar Choudhary** (individual bidder) appeared in top ranks across several projects
—
For more information please see below link:
Download [165.96 KB]
Download [165.96 KB]
Error:Contact form not found.
powerplant
EQ Mazagine•Apr 4, 2026•3 min
powerplant
EQ Mazagine•Apr 4, 2026•2 min
powerplant
EQ Mazagine•Apr 4, 2026•3 min
powerplant
Transformers-Magazine•Apr 4, 2026•2 min
powerplant
Transformers-Magazine•Apr 4, 2026•2 min
powerplant
Switchgear Magazine•Apr 4, 2026•2 min
powerplant
Renewable Energy Magazine•Apr 4, 2026•2 min
powerplant
Biomass Magazine•Apr 4, 2026•4 min
powerplant
Biomass Magazine•Apr 4, 2026•4 min
powerplant
Biomass Magazine•Apr 4, 2026•4 min
powerplant
PV Magazine•Apr 4, 2026•2 min
powerplant
EQ Mazagine•Apr 4, 2026•3 min
powerplant
Transformers-Magazine•Apr 3, 2026•2 min
powerplant
Enerdatics•Apr 3, 2026•2 min
powerplant
EQ Mazagine•Apr 3, 2026•2 min
powerplant
Renewable Watch•Apr 3, 2026•1 min
powerplant
Modern Power Systems•Apr 3, 2026•2 min
powerplant
Energy Global•Apr 3, 2026•2 min
powerplant
Mercom India•Apr 3, 2026•3 min
powerplant
EQ Mazagine•Apr 3, 2026•3 min